Mumbai, August 19, 2025: A Mumbai Monorail stuck on an elevated track near Mysore Colony station today, stranding approximately 400 passengers amid torrential rainfall. The Mumbai Monorail stuck due to a power supply failure around 6:15 PM, prompting a large-scale rescue operation by the Mumbai Fire Brigade and other agencies, who deployed cranes and hydraulic ladders to evacuate commuters. The incident, exacerbated by heavy rain, disrupted services between Chembur and Bhakti Park, highlighting challenges in Mumbai’s transport infrastructure during monsoon season.
In Short
- Mumbai Monorail stuck due to power failure, stranding 400 passengers near Mysore Colony.
- Significant for exposing vulnerabilities in Mumbai’s transport during heavy rain.
- Standout rescue efforts using cranes and ladders to ensure passenger safety.
The Mumbai Monorail stuck on a curve, with its brakes jammed, preventing an initial towing attempt by another monorail, according to the Mumbai Metropolitan Region Development Authority. Emergency teams broke windowpanes to rescue passengers, many of whom reported suffocation due to failed air conditioning and locked doors. The Mumbai Monorail stuck for over two hours, with 300 passengers rescued by 9:15 PM, as confirmed by Municipal Commissioner Bhushan Gagrani. Six commuters, experiencing breathing difficulties, received hospital treatment and were later discharged.
Deputy Chief Minister Eknath Shinde attributed the Mumbai Monorail stuck incident to overcrowding caused by heavy rain, which halted local train services on the Harbour line. The monorail, designed for 109 metric tonnes, was overloaded, leading to a mechanical disconnect of electric current. Chief Minister Devendra Fadnavis assured passenger safety, announcing an inquiry into the Mumbai Monorail stuck event. The Brihanmumbai Municipal Corporation deployed three snorkel vehicles and four buses to transport rescued passengers, responding to distress calls via the 1916 helpline.
The Mumbai Monorail stuck incident coincided with widespread disruptions, as Mumbai recorded 300 mm of rainfall in 24 hours, flooding roads and delaying flights by 40 minutes. Social media platforms amplified passenger accounts, with videos showing chaotic scenes inside the stranded train. The Mumbai Monorail stuck event underscores the city’s monsoon-related challenges, with analysts urging infrastructure upgrades. Authorities restored single-line services between Wadala and Chembur by 8:30 PM, ensuring partial operations. Stay updated at Sarkari—-Result.com.
Mumbai Monorail Incident Key Details
Aspect | Details |
---|---|
Location | Near Mysore Colony station, Mumbai |
Time | 6:15 PM, August 19, 2025 |
Cause | Power supply failure, overcrowding |
Passengers Affected | Approximately 400 |
Rescue Methods | Cranes, hydraulic ladders, window breaking |
Agencies Involved | Mumbai Fire Brigade, BMC, MMRDA |
Service Impact | Halted between Chembur and Bhakti Park |